1. <td id="4pxlb"></td>
      1. 
        

          Welcome to qingzhou Yakai Dredging Machinery Manufacturing Co., LTD. Official website!

            CHINESE

            ENGLISH

          +86 13515363999 +86 13869638158

          +86 536-3807898

          Keywords: dredger, gold panning equipment, sand making equipment, sand washing equipment, screening equipment, sand mining equipment, desilting equipment

          Advanced Search:

          Advantages of new sludge curing treatment equipment

          Source: Time:2018-06-11 16:42:04 views:

          New sludge solidification treatment equipment, river sludge solidification equipment advantages: 1, the realization of the sludge solidification treatment of mobile operations, the equipment is undoubtedly a set of sludge solidification depth treatment equipment can be moved, flexible, can cooperate with the dredging ship beside the road river, land and water dredging.
          New sludge solidification treatment equipment, river sludge solidification equipment advantages: 1, the realization of the sludge solidification treatment of mobile operations, the equipment is undoubtedly a set of sludge solidification depth treatment equipment can be moved, flexible, can cooperate with the dredging ship beside the road river, land and water dredging. 2. It can carry all kinds of materials in water and on land. The hardener truck is used for combined operation with mixing pile, and the hardener is powerfully transported to the silt for mixing together to solidify the silt. After 1 ~ 3 days of curing, the soil with a certain strength is formed, which can be excavated and transported out, and the operation is convenient and flexible. 3. All the equipment is fixed in an airtight box, and the box is connected with the car disk in the form of bolts to facilitate disassembly. It meets the requirements of road vehicles that cannot be improved at will, and can carry sludge treatment equipment on the road; 4. The cover of the box can be easily opened through the connecting rod mechanism of hydraulic control to facilitate the installation and transportation of internal equipment. The top of the box body is designed with openable ventilation and lighting Windows; 5. The flocculation silo and solidification silo are designed with special structure to ensure the combination of movement and movement in the sludge treatment process, that is, to ensure the additive mixing is uniform and the sludge and water separation after sufficient precipitation is guaranteed. In addition, the whole treatment process should be kept continuous rather than intermittent operation. 6. The equipment is used to solidify the silt in ponds, marshes, ports, wharves and river channels. The deep solidification depth of the stirred pile silt can be up to 6 meters. 7, can work continuously for a long time, labor intensity, low cost 8, easy management, simple maintenance
          • Contact us
          • +86 13515363999 +86 13869638158
          • +86 536-3807898
          • Mr. Pan
          • +86 536-3807898
          • No.3337, Yadong Street, Qingzhou Economic Development Zone
          • 魯ICP備19054974號-1
          2021精品久久久久精品免费网首页|波多野办公室激情A片|亚洲av无码一区二区一二区毛片|久久久国产精品一区二|在线日韩欧美巨乳国产|亚洲欧美自拍偷一区二区|中文字幕亚洲一区一区

          1. <td id="4pxlb"></td>
            1.